Oznaka | Vrijednost | Promet | Količina | Kupovna | Prodajna | Promjena |
---|---|---|---|---|---|---|
KOEI | 265,62 | 20.984 | 79 | 264,00 | 266,00 | 0,00% |
KONČAR-ENERGETSKI TRANSFORMATORI d.o.o. je 2022. ostvario ukupni godišnji prihod u iznosu od 156.197.235,12 € što predstavlja relativnu promjenu ukupnih prihoda od 29.378.967,82 € u odnosu na prethodno razdoblje kada je poslovni subjekt ostvario ukupne godišnje prihode u iznosu od 126.818.267,30 €. Poslovni subjekt je tokom posljednje dvije godine poslovao s dobiti. KONČAR-ENERGETSKI TRANSFORMATORI d.o.o. je u 2022. ostvario neto rezultat poslovanja u iznosu od 2.337.316,88 € dok je ostvarena neto marža iznosila 1,50%. Poslovni subjekt KONČAR-ENERGETSKI TRANSFORMATORI d.o.o. u 2022. nije povećavao ni smanjivao broj zaposlenih, a imao je 449 zaposlenika.
Baš gledam malo kakvu jadnu neto maržu ima kpt. Tu mi nešto ne štima, ne znam kako je bilo prošlih godina. Tu svakako leži velika skrivena vrijednost, svakako bi trebalo biti barem 5 posto ili više u trenutačnoj konstelaciji potražnje. Jel ima upućenijih od mene da malo prokomentira?
Nenad Bakic
21 min:$
X
Končar- deep dive (2)?
Prije jedno dva mjeseca sam napisao končar
deep-dive i predvidio još jedan kvartal odličnih
rezultata, što se i ostvarilo
Sada je konsolidirrani EV/EBITDA KOEI oko 5-
što znači da bi grupa končar (da je EBITDA
dobra aproksimacija toka novca od poslovanja
i da nije konsolidirano) mogla SAMU SEBE (sav
dug i svu vrijednost dioničarima) otplatiti u
Svega 5 godina.
Moja slutnja je da kad ‘izbijemo’ dio KODT
koine pripada dioničarima KOEI da bi to moglo
bitijoš dosta niže. Sigurno neću imati vremene
pogledati i što se dogada kad se po ‘suma
dijelova’ izbije i DLKV, za KET nemamo nažalost
kvartalnih podataka
Da li vas zanima takva nekakva analiza
(nemam vremena pa da ne pišem bezveze)?
Evo još jedan ugovorčić. Nek se nađe.
Ako je prognoza za ovu dionicu rast samo 10 tak % do kraja godine onda je dionica u odnosu na ostale sastavnice u grupi u ofsajdu.
dali je končar best buy za drugu godinu. možda ako poveća divku.
Gledam malo dobit kpt u kojem končar ima skoro pola. Ispada da je 2022. bila ekstra loša. Ove godine bi svakako trebalo puuno bolje biti. Općenito sam jako optimističan glede ovog poduzeća.
Dobitak/gubitak
AAA
2020
5.910.324,27
2021
9.284.944,55
2022
2.337.316,88
Nadam se da ce se i dionica odključati
2023 – 20.861.000,00 EUR
Gledam malo dobit kpt u kojem končar ima skoro pola. Ispada da je 2022. bila ekstra loša. Ove godine bi svakako trebalo puuno bolje biti. Općenito sam jako optimističan glede ovog poduzeća.
Dobitak/gubitak
AAA
2020
5.910.324,27
2021
9.284.944,55
2022
2.337.316,88
Did you know that our Laboratory Centre has just made another impressive breakthrough?
Following a rigorous audit of the management system and testing capabilities, Abu Dhabi-based TRANSCO has recently included the Laboratory Center | KONČAR – Electrical Engineering Institute in the commercial list of approved vendors. This achievement further strengthens our position as an approved independent testing laboratory in the competitive UAE market, and validates that our expertise, capabilities, and testing resources position us competitively alongside globally acclaimed laboratories.
The Laboratory Centre consists of laboratories internationally accredited for a wide range of 750 testing and calibration methods in the fields of power engineering, industry, and mobility. Operating as a one-stop testing centre, it provides premium and rapid services to global power engineering equipment manufacturers and certification bodies.
Two months ago we commissioned the new Dam Monitoring and Dispatch Centre (DMDC) in Tirana, for the Albanian power corporation KESH. This inauguration also marks our first Generation Centre beyond Croatia.
As the main contractor, we were responsible for delivering hardware, software, and office equipment, system parameterization at the Centre and power plants, testing, dispatch centre refurbishment, and end-user training. From the DMDC, KESH will monitor the operation and manage the generation of three HPPs on the Drin River Cascade – Fierza HPP, Komani HPP, and Vau and Dejes HPP. The three power plants have a total installed power capacity of 1,350 MW and account for roughly 90% of the total electricity generated in Albania.
The central application installed at the centre is our proprietary SCADA system PROZA NET which has been upgraded for the needs of this project. Congrats to both teams!
Successful cooperation with Finnish partner continues!
KONČAR – Generators and Motors won a new agreement for generator refurbishment at Palokki hydropower plant (HPP) in Finland. This is the third agreement with PKS, following the successful refurbishment of Puntarikoski HPP and generator refurbishment at Kuurna HPP.
The scope of work encompasses the complete refurbishment of the stator with a new housing, core, winding, and shaft, along with pole re-insulation, and an increase in power to 8.5 MVA. KONČAR Electronics and Informatics Ltd. is set to deliver an excitation regulator as part of the project.