IGH (Institut IGH d.d.)

Naslovnica Forum Tržište kapitala Hrvatska IGH (Institut IGH d.d.)

Forum namijenjen svim temama vezanim za dionice, obveznice i druge vrijednosne papire te trgovanje istima u Hrvatskoj.

https://www.linkedin.com/feed/

Russia_New project

IGH signed a new contract with Lenaeroproject (S-Petersburg) for scientific and technical support of design works upon “Reconstruction of the airport complex of the city of Kemerovo”.

Kemerovo is a regional capital of so-called Kuzbass area, and contain a lot of industrial plants and largest coal mines. 4 hours flight from Moscow.
I took a part in developing reconstruction of 2 biggest substations NKAZ-II and Yelanskaya in 2009 in same area, city Novokuznetsk.

Sanacija legendarnog mosta.

 

“Društvo za provedbu nadzora Privredno društvo Institut IGH dd – Banja Luka”. 🙂

 

https://www.klix.ba/vijesti/bih/poruseni-most-bitke-za-ranjenike-ce-biti-ponovo-podignut-iznad-neretve-u-jablanici/210930102

feed-shared-actor–with-control-menu

” style=”box-sizing: inherit; margin-bottom: 8px; padding: 12px 40px 0px 16px; border: var(–artdeco-reset-base-border-zero); vertical-align: var(–artdeco-reset-base-vertical-align-baseline); background-color: #ffffff; flex-wrap: nowrap; align-items: center; color: rgba(0, 0, 0, 0.9); font-family: -apple-system, system-ui, BlinkMacSystemFont, ‘Segoe UI’, Roboto, ‘Helvetica Neue’, ‘Fira Sans’, Ubuntu, Oxygen, ‘Oxygen Sans’, Cantarell, ‘Droid Sans’, ‘Apple Color Emoji’, ‘Segoe UI Emoji’, ‘Segoe UI Emoji’, ‘Segoe UI Symbol’, ‘Lucida Grande’, Helvetica, Arial, sans-serif; display: flex !important;”>



” style=”box-sizing: inherit; margin: var(–artdeco-reset-base-margin-zero); padding: var(–artdeco-reset-base-padding-zero); border: var(–artdeco-reset-base-border-zero); font-size: var(–artdeco-reset-base-font-size-hundred-percent); vertical-align: var(–artdeco-reset-base-vertical-align-baseline); background: var(–artdeco-reset-base-background-transparent); display: flex !important;”>Institut IGH d.d.




t-black” style=”box-sizing: inherit; margin: var(–artdeco-reset-base-margin-zero); padding: var(–artdeco-reset-base-padding-zero); border: var(–artdeco-reset-base-border-zero); font-size: var(–artdeco-reset-typography_getFontSize); vertical-align: top; background: var(–artdeco-reset-base-background-transparent); outline: var(–artdeco-reset-base-outline-zero); color: var(–color-text); font-weight: var(–artdeco-reset-typography-font-weight-bold); –artdeco-reset-typography_getfontsize: 1.4rem; –artdeco-reset-typography_getlineheight: 1.42857; line-height: var(–artdeco-reset-typography_getLineHeight); white-space: nowrap; overflow: hidden; text-overflow: ellipsis; display: inline-block;” data-entity-hovercard-id=”urn:li:fs_miniCompany:205515″>Institut IGH d.d. t-black–light” style=”box-sizing: inherit; margin: var(–artdeco-reset-base-margin-zero); padding: var(–artdeco-reset-base-padding-zero); border: var(–artdeco-reset-base-border-zero); font-size: var(–artdeco-reset-typography_getFontSize); vertical-align: var(–artdeco-reset-base-vertical-align-baseline); background: var(–artdeco-reset-base-background-transparent); outline: var(–artdeco-reset-base-outline-zero); color: var(–color-text-low-emphasis); font-weight: var(–artdeco-reset-typography-font-weight-normal); –artdeco-reset-typography_getfontsize: 1.2rem; –artdeco-reset-typography_getlineheight: 1.33333; line-height: var(–artdeco-reset-typography_getLineHeight); white-space: nowrap; overflow: hidden; text-overflow: ellipsis; display: block;”>5,451 followers t-black–light” style=”box-sizing: inherit; margin: var(–artdeco-reset-base-margin-zero); padding: var(–artdeco-reset-base-padding-zero); border: var(–artdeco-reset-base-border-zero); font-size: var(–artdeco-reset-typography_getFontSize); vertical-align: var(–artdeco-reset-base-vertical-align-baseline); background: var(–artdeco-reset-base-background-transparent); outline: var(–artdeco-reset-base-outline-zero); color: var(–color-text-low-emphasis); font-weight: var(–artdeco-reset-typography-font-weight-normal); –artdeco-reset-typography_getfontsize: 1.2rem; –artdeco-reset-typography_getlineheight: 1.33333; line-height: var(–artdeco-reset-typography_getLineHeight); white-space: nowrap; overflow: hidden; text-overflow: ellipsis; display: block;”>1h • Edited • 1 hour ago








feed-shared-update-v2__description feed-shared-inline-show-more-text–minimal-padding

feed-shared-inline-show-more-text–expanded
” style=”box-sizing: inherit; margin: 0px 16px; padding: var(–artdeco-reset-base-padding-zero); border: var(–artdeco-reset-base-border-zero); font-size: var(–artdeco-reset-base-font-size-hundred-percent); vertical-align: var(–artdeco-reset-base-vertical-align-baseline); background: var(–artdeco-reset-base-background-transparent); outline: none; position: relative; max-width: 928px; –artdeco-reset-typography_getlineheight: 1.42857; max-height: none; overflow: hidden; -webkit-line-clamp: initial; line-height: 2rem !important;” tabindex=”-1″ data-artdeco-is-focused=”true”>

[Krk Bridge rehabilitation project]

Phase 3 of the #rehabilitation of the Krk bridge has started. A project worth 55 million HRK. Comprehensive works began in 2020, 40 years after its opening and will be finished by the beginning of tourist season 2022.

Like 40 years ago, Institut IGH is involved in the project by providing engineering investigation, rehabilitation design services, supervision, and quality control services.

The bridge became world-famous because the concrete arch, which reaches the island of Sveti Marko, was the longest concrete arch globally, with 390 meters at that time.

To read more follow the link: https://bit.ly/KrkBridge


Moscow, Russia

IGH signed a contract and commenced design works within “Construction of a road network with artificial structures and reconstruction of engineering communications on the section from the MKAD to the Solntsevo-Butovo-Varshavskoe Highway. The tunnel under the MKAD (Moscow Ring Road)”
JSC “Institute IGH” to perform a structural design of upper part of tubular sheet pile, and make revision of design solution for the lower part of the protective screen of tubular sheet pile (reducing the number of lower sections of tubular sheet pile).

Today total length of MKAD (Moscow Ring Road) is 109 km

Predsjednik Uprave HŽ Infrastrukture Ivan Kršić istaknuo je da vrijednost projekata izgradnje i modernizacije željezničke infrastrukture do 2030. doseže 5,4 milijarde eura, a ukupna duljina obnovljenih i moderniziranih pruga će iznositi 780 kilometara ili oko 30 posto ukupne mreže, a za što je uglavnom predviđeno sufinanciranje iz EU-ovih sredstava u visini od 85 posto…..

…,.https://www.seebiz.eu/trzista/butkovic-zeljeznicu-do-2030-podici-na-europsku-razinu/266299

drukeri na ignore: bisakovi, serislav,, neumoran, https://www.youtube.com/watch?v=VKlf7Llcl5U&list=LLzzxP81UKsk5js-Yy0dtuHw&index=79

Ukupna vrijednost do sada ugovorenih poslova u 2021. već sada prelazi 100 milijuna kuna….,https://www.nacional.hr/institut-igh-nastavlja-s-ugovaranjem-novih-poslova/;

drukeri na ignore: bisakovi, serislav,, neumoran, https://www.youtube.com/watch?v=VKlf7Llcl5U&list=LLzzxP81UKsk5js-Yy0dtuHw&index=79

Vidim tamo sa strane IGH-ovca koji budno prati i nadzire što se i kako radi, da se ne bi fušalo. 🙂

 

FOTO: Počelo asfaltiranje Pelješkog mosta, pogledajte kako teku radovi

I treba da se žale, jer su kao najkompetentniji trebali dobiti i taj posao. I dobit će ga.

 

https://www.tportal.hr/vijesti/clanak/hazu-u-cajtnotu-zbog-zalbi-ponistene-nabave-pa-visi-obnova-dviju-zgrada-stradalih-u-potresu-s-bespovratnih-107-milijuna-kuna-foto-20211015

 

Neki od značajnih natječaja-čeka se odluka DKOM HR



1.Usluga izrade projektne dokumentacije za modernizaciju pruge Okučanu Vinkovci za grupu 1 i grupu4. IGH, Granovad.d. i Rijeka projekt d.o.o.


2.Aglomeracija Split-Solin, usluga za nadzor gradnje za ugovore 1 i 6


3.Projekt 1. faza modernizacije tramvajske infrastrukture u ZG.


4.Izrada projektne i tehničke dokumentacijeobnove zgrade sveučilišta u ZG i Pravnog fakulteta n aadresi Trg Republike Hrvatske 14.



Nešto će i tu ubosti…

Još jedan ozbiljan posao. Projektant je IGH.

“Prema Urbanističkom planu uređenja obuhvat velike turističke zone Marina Lučica iznosi 16,82 hektara. Radovi na izgradnji kanalizacije i vodoopskrbe započeli su travnju ove godine, a vrijednost radova je tridesetak milijuna kuna. Za 18 mjeseci kompletna infrastruktura treba bi biti dovršena. Glavni izvođač radova je tvrtka Esotech d.o.o. iz Slovenije, uključen je Jadranski ronilački servis d.o.o. iz Šibenika, a projektant je INSTITUT IGH d.d. iz Zagreba. Tvrtka M.L. Bay Development d.o.o. iz Austrije investitor je u TZ Marina Lučica, a uporedno s infrastrukturom započeli su radovi i na turističkim sadržajima ukupne vrijednosti 103 milijuna eura”.

 

https://www.primostenplus.com/hrvatske-ceste-otkupljuju-zemljiste-u-primostenu-za-gradnju-novog-raskrizja-prema-gospi-od-loreta-i-buducem-resortu/

 

Mislim da se ovdje previše licitira kojekakvim posloovima i očekivanjima s te strane. Neće ovdje katalizator rasta i promjene trenda biti poslovi, iako su oni nužni da bi se podržao rast i pokrile obveze, pogotovo one prema opredstečajnim vjerovnicima, bankama i založnim vlasnicima imovine.

 

Ovdje će rast podržati refinanciranje dospjelih (PS) dugova, što će otovoriti mogućnost da društvo stane na noge i započne nesmetano poslovanje neopterećno grijesima prošlosti. Kad i ako se to dogodi moglo bi se početi licitirati s cijenama dionice od 200, 300, 500 pa i više kuna. Naravno, pod uvjetom da taj manevar uspije i da rezultata.

Niti ova sanacija ne može proći bez IGH-a.

 

https://www.24sata.hr/news/kopacki-rit-dali-su-milijune-a-setnica-je-istrulila-umjesto-od-hrasta-dio-napravili-od-topole-790723

Čisto za informaciju.

Nefinacijski vjerovnici iz predstečajne nagodbe su u potpunosti riješeni, isplatom zadnje desete rate.

Vjerovnici sa založnim pravima su vrlo nedavno uglavnom svi riješeni zamjenom nekretnina za dugove.

Financijski vjerovnici nisu problem jer im ne pada na pamet ići se prisilno naplaćivati putem ovrhe.

Nije provjerena informacija, ali Sergej je navodno svojim vlastitim novcem krenuo otkupljivati dugove od financijskih vjerovnika. S obzirom da je većinski vlasnik, itekako mu je u interesu da  se teret dugova što prije riješi i zatvori PSN. Zatvaranje PSN će biti dovoljno velika vijest za ozbiljan pomak cijene dionice na burzi, što je i njemu u interesu.  IGH će mu kad se naplate svi ugovoreni i radovi u tijeku vratiti novac. Vjerojatno sa manjim kamatama nego što lihvare banke.

Ja ovdje vidim sve bolju i sve ljepšu budućnost.

Vas male dioničare ovdje će uskoro “ruski kapital” razvodniti jer će taj Vaš navodni većinski dodatno usitniti kada od firme bude prebijao dug preko udjela. Pa zar zaista mislite da će rus svojim novcem spašavati firmu a da se ne okoristi. Ajme, kakve iluzije?

Može li biti bedastijeg rezona? Svojim novcem ne spašava firmu, jer firma nije u nikakvoj opasnosti. Samo olakšava poslovanje. A okoristit će se samim time što će računi Njegove firme prodisati. Što tu nije jasno?

Radi se o posudbi, a ne o dokapitalizaciji. Zar je to tako teško shvatiti? Nekima očito je.

New Report

Close